Hearings aheadNext two weeks4

New & changed2

Weld County95 proposals

  1. Trucking, Transporation and Contractor's Shop

    31156 County Road 50, Kersey

    Under review Zoning permit for an agricultural or rural use

    A trucking and transportation operation with a contractor’s shop

    ZPAG26-0022 · Weld County planning cases

  2. Winery and Vineyard

    25616 County Road 392, Greeley

    Under review Zoning permit for an agricultural or rural use

    A winery and vineyard in an agricultural zone

    • Farms and animals

    ZPAG26-0021 · Weld County planning cases

  3. Trucking & Transportation Company

    24250 60 1/2, Greeley

    Under review Zoning permit for an agricultural or rural use

    A trucking and transportation company.

    ZPAG26-0020 · Weld County planning cases

  4. Trucking and Transportation Company

    7606 County Road 10, Fort Lupton

    Under review Zoning permit for an agricultural or rural use

    A trucking and transportation company.

    ZPAG26-0019 · Weld County planning cases

  5. Trucking and Transportation Company

    3506 Cr 19

    Under review Zoning permit for an agricultural or rural use

    A trucking and transportation company.

    ZPAG26-0018 · Weld County planning cases

  6. Amend ZPAG23-0014

    27071 County Road 15, Johnstown

    Under review Zoning permit for an agricultural or rural use

    Adding an 8,000-square-foot building for an insulation contractor's shop.

    • 8,000 sq. ft.

    ZPAG26-0017 · Weld County planning cases

  7. Trucking and Transportation Company

    13565 2 1/2, Brighton

    Under review Zoning permit for an agricultural or rural use

    A trucking and transportation company.

    ZPAG26-0016 · Weld County planning cases

  8. Trucking and Transportation Company

    25895 County Road 42, Kersey

    Under review Zoning permit for an agricultural or rural use

    A trucking and transportation company.

    ZPAG26-0015 · Weld County planning cases

  9. Contractor Shop

    9139 County Road 54, Milliken

    Under review Zoning permit for an agricultural or rural use

    A contractor shop

    ZPAG26-0013 · Weld County planning cases

  10. Agritourism Facility

    7990 Cr 1

    Under review Zoning permit for an agricultural or rural use

    A U-pick lavender experience and farm store

    • Farms and animals

    ZPAG26-0012 · Weld County planning cases

  11. Contractor Shop

    2701 F St, Greeley

    Under review Zoning permit for an agricultural or rural use

    A contractor shop

    ZPAG26-0011 · Weld County planning cases

  12. Trucking and Transportation Company

    19495 County Road 44, La Salle

    Under review Zoning permit for an agricultural or rural use

    A trucking and transportation business

    ZPAG26-0010 · Weld County planning cases

  13. Contractor Shop

    33421 County Road 33, Greeley

    Under review Zoning permit for an agricultural or rural use

    A contractor shop

    ZPAG26-0009 · Weld County planning cases

  14. Landscaping Business

    31496 County Road 29, Greeley

    Under review Zoning permit for an agricultural or rural use

    A landscaping business

    • Shops, restaurants and services

    ZPAG26-0008 · Weld County planning cases

  15. Rodeo Dunes Golf Course

    35587 I-76 Frontage Rd, Roggen

    Approved Zoning permit for an agricultural or rural use

    A golf resort with lodging accommodations.

    • Shops, restaurants and services

    ZPAG26-0007 · Weld County planning cases

  16. Contractor Shop (Electrical Business)

    13207 County Road 18, Fort Lupton

    Approved Zoning permit for an agricultural or rural use

    An electrical contractor shop.

    • Shops, restaurants and services

    ZPAG26-0006 · Weld County planning cases

  17. Trucking Company

    10756 County Road 20, Fort Lupton

    Under review Zoning permit for an agricultural or rural use

    A trucking company.

    ZPAG26-0005 · Weld County planning cases

  18. Contractor Shop for Heating & Cooling

    6363 County Road 20, Longmont

    Under review Zoning permit for an agricultural or rural use

    A contractor shop for a heating and cooling business.

    • Shops, restaurants and services

    ZPAG26-0004 · Weld County planning cases

  19. Brewery

    7865 County Road 2, Brighton

    Approved Zoning permit for an agricultural or rural use

    A brewery added to a winery.

    • Industry and storage

    ZPAG26-0003 · Weld County planning cases

  20. Coffee Roaster

    38434 County Road 13, Fort Collins

    Under construction Zoning permit for an agricultural or rural use

    A coffee roasting operation.

    • Industry and storage

    ZPAG26-0002 · Weld County planning cases

  21. Contractor's Shop

    0

    Under review Zoning permit for an agricultural or rural use

    A contractor's shop.

    • Shops, restaurants and services

    ZPAG26-0001 · Weld County planning cases

  22. Hemp Processing Facility

    7904 County Road 19, Fort Lupton

    Approved Zoning permit for an agricultural or rural use

    A hemp processing facility.

    • Industry and storage

    ZPAG25-0017 · Weld County planning cases

  23. Contractor Shop

    4060 Martin St, Brighton

    Under review Zoning permit for an agricultural or rural use

    A contractor shop for marble and granite countertops.

    ZPAG25-0007 · Weld County planning cases

  24. Law Trucking Agricultural Support Business

    35215 County Road 55, Eaton

    Under construction Zoning permit for an agricultural or rural use

    A trucking company hauling agricultural products.

    ZPAG25-0001 · Weld County planning cases

  25. Solar Energy Facility

    38561 County Road 43, Eaton

    Under review Use by special review

    A solar energy facility on 76 acres.

    • Energy
    • 76 acres

    USR26-0030 · Weld County planning cases

  26. Solar Energy Facility

    35208 County Road 15, Windsor

    Under review Use by special review

    A solar energy facility on a 116-acre site.

    • Energy
    • 116 acres

    USR26-0029 · Weld County planning cases

  27. Kennel

    24120 County Road 8, Hudson

    Under review Use by special review

    A kennel for boarding up to 21 dogs and 7 cats on a 6.02-acre site.

    • 6.02 acres

    USR26-0027 · Weld County planning cases

  28. Commercial Junkyard and Salvage Yard

    12433 County Road 41, Fort Lupton

    Under review Use by special review

    A commercial junkyard and salvage yard on a 40-acre site.

    • 40 acres

    USR26-0026 · Weld County planning cases

  29. Natural Gas Compressor Station

    0

    Under review Use by special review

    A natural gas compressor station on a 78.84-acre site.

    • 78.8 acres

    USR26-0025 · Weld County planning cases

  30. Tri-Town Paws Kennel

    1988 Mountain View Dr, Erie

    Under review Use by special review

    A kennel in a subdivision on a 0.93-acre site.

    • 0.93 acres

    USR26-0024 · Weld County planning cases

  31. Water Treatment Plant

    0 120 Cr

    Under review Use by special review

    A water treatment plant on a 36.77-acre site.

    • Schools, churches and public buildings
    • 36.8 acres

    USR26-0023 · Weld County planning cases

  32. Lumberyard/Woodworking

    24960 County Road 61, Kersey

    Under review Use by special review

    A lumberyard and woodworking operation on a 0.55-acre site.

    • 0.55 acres

    USR26-0022 · Weld County planning cases

  33. Sand & Gravel Mine

    13473 County Road 17, Platteville

    Under review Use by special review

    Open sand and gravel mining is proposed on 196.4 acres.

    • Mining, oil and gas
    • 196 acres

    USR26-0021 · Weld County planning cases

  34. Kennel

    18250 County Road 19, Milliken

    Under review Use by special review

    A dog boarding kennel for up to 60 dogs on 9.67 acres

    • 9.67 acres

    USR26-0020 · Weld County planning cases

  35. Data Center

    2000 Howard Smith

    Under review Use by special review

    A data center on a 41-acre site

    • Before the Weld County Board of County Commissioners Oct. 19
    • 41 acres

    USR26-0019 · Weld County planning cases

  36. Kennel

    2396 County Road 12, Erie

    Under review Use by special review

    A kennel for boarding up to 30 dogs on a 5.579-acre site.

    • Before the Weld County Planning Commission Nov. 3
    • 5.58 acres

    USR26-0018 · Weld County planning cases

  37. Kennel

    Under review Use by special review

    A kennel for boarding up to 30 dogs on 35.755 acres.

    • 35.8 acres

    USR26-0017 · Weld County planning cases

  38. Oil and Gas Support and Trucking

    Under review Use by special review

    Oil and gas support services and a trucking operation on 8.75 acres.

    • Industry and storage
    • 8.75 acres

    USR26-0016 · Weld County planning cases

  39. Solar Energy Facility

    Under review Use by special review

    A solar energy facility on 35 acres.

    • Before the Weld County Board of County Commissioners Oct. 21
    • Energy
    • 35 acres

    USR26-0015 · Weld County planning cases

  40. Mining

    Under review Use by special review

    A sand mining plant on 39 acres.

    • Mining, oil and gas
    • 39 acres

    USR26-0014 · Weld County planning cases

  41. Commercia Junkyard

    19570 County Road 28, Fort Lupton

    Under review Use by special review

    A commercial junkyard and oil and gas support and service operation on 39.9 acres.

    • Industry and storage
    • 39.9 acres

    USR26-0013 · Weld County planning cases

  42. Event Facility

    2444 County Road 17, Brighton

    Under review Use by special review

    An event facility and campground on 31.00 acres.

    • 31 acres

    USR26-0012 · Weld County planning cases

  43. Trucking Transportation Company

    Under review Use by special review

    A trucking transportation company.

    • Industry and storage

    USR26-0009 · Weld County planning cases

  44. Solar Energy Facility

    2781 County Road 66, Greeley

    Under review Use by special review

    A solar energy facility on 25 acres.

    • Before the Weld County Board of County Commissioners Oct. 21
    • Energy
    • 25 acres

    USR26-0007 · Weld County planning cases

  45. Events Facility

    Under review Use by special review

    An event facility.

    • Shops, restaurants and services

    USR26-0006 · Weld County planning cases

  46. Event Facility

    15600 County Road 6, Fort Lupton

    Under review Use by special review

    An event facility on 39.5 acres.

    • Shops, restaurants and services
    • 39.5 acres

    USR26-0005 · Weld County planning cases

  47. Oil & Gas Support and Service and Trucking Operation

    24963 County Road 16, Keenesburg

    Under review Use by special review

    An oil and gas support and service operation with trucking on 63 acres.

    • Industry and storage
    • 63 acres

    USR26-0004 · Weld County planning cases

  48. Telecommunication Tower

    9836 48 1/2, Milliken

    Under review Use by special review

    A 150-foot telecommunications antenna tower on 12.5 acres.

    • Roads, utilities and lots
    • 12.5 acres

    USR26-0003 · Weld County planning cases

  49. Solar Energy Facility

    Approved Use by special review

    A solar energy facility on 225.4 acres.

    • Energy
    • 225 acres

    USR26-0002 · Weld County planning cases

  50. Toro Events Center

    675 16 1/2, Longmont

    Approved Use by special review

    An event facility on 7.8 acres.

    • Shops, restaurants and services
    • 7.8 acres

    USR26-0001 · Weld County planning cases

  51. Landscaping Business

    3159 County Road 52, Erie

    Approved Use by special review

    A landscaping services business on a 1.03-acre site

    • Shops, restaurants and services
    • 1.03 acres

    USR25-0023 · Weld County planning cases

  52. Kennel

    4158 County Road 59, Keenesburg

    Approved Use by special review

    A kennel boarding up to 60 dogs on a 10.16-acre site

    • 10.2 acres

    USR25-0022 · Weld County planning cases

  53. Battery Energy Storage Facility (BESS)

    14900 County Road 36, Platteville

    Approved Use by special review

    A battery energy storage system on a 34.89-acre site

    • Energy
    • 34.9 acres

    USR25-0021 · Weld County planning cases

  54. Lone Tree Creek Event Center

    33546 County Road 49, Greeley

    Under construction Use by special review

    An event facility on an 8.1-acre site

    • 8.1 acres

    USR25-0020 · Weld County planning cases

  55. 70 Ranch Sand Mine

    0

    Approved Use by special review

    A sand and gravel mine with mineral processing on 640 acres

    • Mining, oil and gas
    • 640 acres

    USR25-0019 · Weld County planning cases

  56. Battery Energy Storage Facility (BESS)

    Under construction Use by special review

    A battery energy storage facility on a 324-acre site

    • Energy
    • 324 acres

    USR25-0018 · Weld County planning cases

  57. Solar Energy Facility

    Under construction Use by special review

    A solar energy facility on 56.341 acres.

    • Energy
    • 56.3 acres

    USR25-0016 · Weld County planning cases

  58. Dog Kennel

    14737 County Road 3, Longmont

    Approved Use by special review

    A dog-training and boarding kennel for up to eight dogs on 4.84 acres.

    • 4.84 acres

    USR25-0015 · Weld County planning cases

  59. Mining (topsoil)

    0

    Under review Use by special review

    Open topsoil mining on 131.894 acres.

    • Mining, oil and gas
    • 132 acres

    USR25-0013 · Weld County planning cases

  60. Kennel

    4786 Cr 50

    Approved Use by special review

    A kennel boarding up to 56 dogs and five small animals

    USR25-0012 · Weld County planning cases

  61. Compressor Station

    Approved Use by special review

    A natural-gas compressor station on 35 acres.

    • 35 acres

    USR25-0010 · Weld County planning cases

  62. Syrcuit Energy Solutions Solar Energy Facility

    53

    Under construction Use by special review

    A solar energy facility on 98.614 acres.

    • Energy
    • 98.6 acres

    USR25-0006 · Weld County planning cases

  63. RDC CO Weld County Rd 49 LLC Solar Energy Facility

    38876 County Road 49, Eaton

    Approved Use by special review

    A solar energy facility on 72.89 acres

    • Energy
    • 72.9 acres

    USR25-0005 · Weld County planning cases

  64. CAW Equities, LLC Mining

    20587 County Road 29, Platteville

    Approved Use by special review

    Aggregate mining and a batch plant on 609 acres.

    • Mining, oil and gas
    • 609 acres

    USR24-0026 · Weld County planning cases

  65. Taelor Solar

    12475 County Road 95, Roggen

    Approved Use by special review

    A solar farm of up to 650 megawatts AC, with battery storage planned for 650 megawatt-hours and a possible increase to 1,300, on 4,300 acres.

    • Energy
    • 4,300 acres

    USR24-0014 · Weld County planning cases

  66. Prospect Solar Project

    33518 County Road 4, Keenesburg

    Approved Use by special review

    A 199-megawatt AC solar facility on 1,500 acres with 100-megawatt AC battery storage, a substation and transmission line.

    • Energy
    • 1,737 acres

    USR24-0013 · Weld County planning cases

  67. Janus Solar Project

    1405 County Road 73, Roggen

    Approved Use by special review

    An 80-megawatt AC solar facility on 700 acres with 20-megawatt AC battery storage, a substation and electrical line connection.

    • Energy
    • 700 acres

    USR24-0012 · Weld County planning cases

  68. Outdoor Storage

    19 E Cr

    Under review Site plan review

    Outdoor storage for construction equipment.

    SPR26-0010 · Weld County planning cases

  69. Outdoor Storage

    Under review Site plan review

    Outdoor storage for RVs and boats

    SPR26-0009 · Weld County planning cases

  70. Convenience Store and Gas Station

    4821 Yellowstone Dr, Greeley

    Under review Site plan review

    A convenience store and gas station

    • Shops, restaurants and services

    SPR26-0008 · Weld County planning cases

  71. Empire Business Park

    2497 W I 25 Frontage Rd, Erie

    Under review Site plan review

    Industrial and office buildings on a 49.579-acre site

    • Homes with shops or offices
    • 49.6 acres

    SPR26-0007 · Weld County planning cases

  72. Car Dealersehip

    Under review Site plan review

    A car dealership on 9.75 acres

    • Shops, restaurants and services
    • 9.75 acres

    SPR26-0004 · Weld County planning cases

  73. Outdoor and RV Storage in the I-2 Zone District

    1492 County Road 11, Erie

    Under review Site plan review

    Outdoor and RV storage, with cargo containers, on 32.238 acres.

    • Industry and storage
    • 32.2 acres

    SPR26-0003 · Weld County planning cases

  74. Outdoor Storage in C-3 Zone District

    312 County Road 19, Brighton

    Under review Site plan review

    Outdoor storage for RVs, boats and cars on 34.9 acres

    • 34.9 acres

    SPR26-0002 · Weld County planning cases

  75. RV and Boat Storage in I-2 Zone District

    16706 Bakers Way, La Salle

    Under construction Site plan review

    A manufacturing and RV and boat storage site on 12 acres.

    • Industry and storage
    • 12 acres

    SPR26-0001 · Weld County planning cases

  76. Ag Support & Service Facility

    240 5th St, Greeley

    Under construction Site plan review

    An agricultural machinery sales, repair and service facility

    • Shops, restaurants and services

    SPR25-0014 · Weld County planning cases

  77. Distribution Center for Seed Storage

    Under construction Site plan review

    A seed storage distribution center

    • Industry and storage

    SPR25-0012 · Weld County planning cases

  78. Outdoor storage of semi-trucks

    Under construction Site plan review

    Outdoor storage for semi-trucks

    • Industry and storage

    SPR25-0011 · Weld County planning cases

  79. Warehouse, Office and Outdoor Storage in the I-3 Zone District

    22303 I-76 Frontage Rd, Hudson

    Under construction Site plan review

    A warehouse with offices and outdoor storage

    • Industry and storage

    SPR25-0010 · Weld County planning cases

  80. Office, Outdoor Storage, Vehicle Rental, Sales and/or Repair Establishment

    12524 25 1/2, Fort Lupton

    Approved Site plan review

    An office and outdoor storage for vehicle rental, sales, service or repair on 3.259 acres.

    • Industry and storage
    • 3.26 acres

    SPR25-0008 · Weld County planning cases

  81. Vehicle Service and Repair Shop

    2974 County Road 37, Brighton

    Under construction Site plan review

    A vehicle service and repair shop on 2 acres.

    • Shops, restaurants and services
    • 2 acres

    SPR25-0006 · Weld County planning cases

  82. Gilbert Contracting, Inc.

    12706 County Road 4, Brighton

    Under review Site plan review

    Offices, outdoor storage, truck parking and a warehouse on 2.99 acres.

    • Industry and storage
    • 2.99 acres

    SPR25-0005 · Weld County planning cases

  83. Construction Equipment, Truck Parking and Warehouse

    12628 County Road 4, Brighton

    Under review Site plan review

    Offices, outdoor construction-equipment storage, truck parking and a warehouse on 2.08 acres.

    • Industry and storage
    • 2.08 acres

    SPR25-0004 · Weld County planning cases

  84. Chalk Bluffs Wind and Solar Facilities

    68300 E 25 Frontage Rd, Carr

    Under review State interest facility

    A wind facility generating 380 megawatts and two solar facilities generating 425 megawatts, with substations, battery storage and transmission lines, on 25,200 acres.

    • Energy
    • 25,200 acres

    SIF26-0002 · Weld County planning cases

  85. Solar Energy Facility

    63546 County Road 67, Grover

    Approved State interest facility

    A solar facility with arrays generating up to 140 MW-AC (177.8 MW-DC), a substation and related facilities, on 1,414 acres.

    • Energy
    • 1,414 acres

    SIF26-0001 · Weld County planning cases

  86. Agricultural to I-3 (Heavy Industrial)

    Under review Change of zone

    Changing agricultural zoning to heavy industrial

    • Before the Weld County Planning Commission Nov. 3
    • Industry and storage

    COZ26-0003 · Weld County planning cases

  87. Ag to C-3 (Business Commercial)

    Approved Change of zone

    Changing the zoning from agricultural to business commercial.

    • Before the Weld County Board of County Commissioners Oct. 19
    • Shops, restaurants and services
    • 80 acres

    COZ26-0001 · Weld County planning cases

  88. Ag to I-2 (Medium Industrial)

    1492 County Road 11, Erie

    Approved Change of zone

    Rezoning 32.28 acres from agricultural to medium industrial zoning.

    • Industry and storage
    • 32.3 acres

    COZ25-0006 · Weld County planning cases

  89. Ag to I-2 (Medium Industrial)

    2021 County Road 27, Fort Lupton

    Approved Change of zone

    Changing 1.956 acres from agricultural to medium-industrial zoning

    • Industry and storage
    • 1.96 acres

    COZ25-0002 · Weld County planning cases

  90. Upgrades to existing substation

    9379 Cr 34

    Under construction Site plan review

    Upgrading the existing St. Vrain Power Plant substation to 245 kV on a 629-acre site

    • Energy
    • 629 acres

    2AMSPR25-82-10 · Weld County planning cases

  91. Water Storage Tanks

    7776 County Road 14, Fort Collins

    Approved Use by special review

    Two potable water storage tanks, one holding 7.5 million gallons and the other 5 million, on 5.5 acres.

    • Roads, utilities and lots
    • 5.5 acres

    1MJUSR26-89-885 · Weld County planning cases

  92. Raggsdale Reservoirs Project

    8987 County Road 85, Fort Lupton

    Under review Use by special review

    Expanding a mine for sand, gravel, stone and other materials by approximately 27 acres and adding a conveyor belt on 667.97 acres.

    • Mining, oil and gas
    • 668 acres

    1MJUSR26-20-0030 · Weld County planning cases

  93. Amendment to USR-1435 to expand the Nissen Gravel Mine

    Under review Use by special review

    Expanding a sand and gravel mine and adding processing on 164 acres.

    • Mining, oil and gas
    • 164 acres

    1MJUSR26-05-1435 · Weld County planning cases

  94. Fort St. Vrain Units 7&8

    9379 County Road 34, Platteville

    Under construction Use by special review

    Two natural-gas-fired combustion turbines and associated facilities proposed for the Fort St. Vrain generating facility on a 640-acre site.

    • Energy
    • 640 acres

    1MJUSR25-08-1647 · Weld County planning cases

  95. Adjust boundary of Lot 1 of RES24-0005

    630 O St, Greeley

    Approved Site plan review

    A lot boundary adjustment to match another lot boundary.

    1AMSPR25-13-0013 · Weld County planning cases

From City of Fort Collins development review (read Oct. 18), City of Loveland current development (read Oct. 18), City of Greeley development projects (read Oct. 18) and Weld County planning cases (read Oct. 18). A proposal is a plan filed for review, and it may change or be withdrawn before anything is built.